Quality Process

Every order runs through a documented quality system: specifications are checked before production, inspection follows one standard, and records trace each part. The same checks apply to first articles and to every production batch.

ISO 9001:2015 certified (TÜV SÜD)
CoC and MTR with every order
FAI and CMM reports on request
Inspection reportDimensions (CMM)Surface (Ra)Material (MTR)Conformance (CoC)
98%+Quality acceptance rate
ISO 9001TÜV SÜD certified
AS9100Capability in the network
5 layersOf QA on every order

Supplier Standards

Quality starts before manufacturing. Every supplier is assessed before joining the network and monitored on every order after that.

Certification Requirements

ISO 9001 certification is the baseline for every supplier. AS9100-capable suppliers are designated for defense and aerospace orders that require that standard.

Facility and Equipment Evaluation

Facilities and equipment are evaluated before a supplier is matched to your order, so the process and precision fit your requirements.

Continuous Performance Monitoring

Supplier performance is tracked on every order after onboarding, and customer feedback affects each supplier's standing in the network.

Five Layers of Quality Assurance

Applied in order on every job, from your first upload to the parts arriving at your door.

1

Specification Verification and DFM

Your design is checked against your specifications before production. AI flags tolerance conflicts and DFM issues such as impossible geometry, thin walls and deep pockets, then an engineer confirms the order is ready to manufacture.

2

Standardised Protocols

The same quality checks apply across all network partners. Every order is made to ISO 2768 tolerances and GD&T principles, so results stay consistent whichever supplier does the work.

3

Advanced Inspection

Coordinate measuring machines (CMMs) for 3D dimensional checks, optical comparators and vision systems for 2D features, surface roughness testers, and calibrated gauges and custom fixtures.

  • CMM
  • Optical comparators
  • Ra and Rz testers
  • Calibrated gauges
4

Digital Traceability

Records are kept throughout production. Material Test Reports (MTRs), Certificates of Conformance (CoCs) and First Article Inspection (FAI) reports trace each part from raw material to delivery.

5

Defect Prevention and Feedback

The aim is to prevent defects instead of catching them late. DFM analysis and supplier matching cut defect risk before manufacturing starts, and customer feedback on every order feeds into supplier evaluation.

What Ships with Your Parts

Documents that trace each part from raw material to delivery, ready to file with your own records.

Standard with every order

Certificate of Conformance (CoC)

States that the parts conform to your requirements, with the order details, material, process and the standards met.

Standard with every order

Material Test Report (MTR)

Certifies the material used, including heat or lot number, chemical composition and mechanical properties, traceable from mill to finished part.

Available on request

First Article Inspection (FAI)

Dimensional verification of the first part against your drawing, confirming the production setup before the full batch runs.

Frequently Asked Questions

If your question is not here, the team can answer it directly.

What does ISO 9001:2015 mean in practice for my order?

The certification is verified by TÜV SÜD. Every order follows a documented quality management system: specifications are checked before production, inspection follows standard protocols, and traceability documents ship with your parts.

Do you provide CMM inspection reports?

Yes. CMM reports are available on request for precision orders. First Article Inspection reports are also available on request, and Certificates of Conformance and Material Test Reports ship as standard.

How do you handle first article vs. production runs?

The first article is inspected and approved before the production run begins. Once the first part matches your specification, the same quality protocols apply across the full batch, so production matches the first article.

What documentation ships with my parts?

A Certificate of Conformance (CoC) and a Material Test Report (MTR) as standard. First Article Inspection (FAI) and CMM reports are available on request for precision orders.

Are your suppliers AS9100 certified?

AS9100 capability exists in the supplier network, mainly for defense and aerospace customers. Every supplier is assessed on certifications, facilities and performance before and during engagement.

What happens if parts don't pass quality inspection?

Parts that fail inspection are not shipped. The failure triggers an investigation and affects the supplier's performance evaluation. Because of the DFM review and supplier matching up front, most issues are caught before production.

Place Your Order

Upload your CAD file for an AI-assisted quote within 24 hours. Complex orders get an engineering review.

WhatsApp Chat